By the end of 2016 a manufacturing and production building with an office area, a training center, a factory canteen, underground parking as well as an 18 meter high rack warehouse will emerge in the surroundings of the Systemhaus. The major project is a courageous and important step towards the future and a commitment to the region Hohenlohe. The ground-breaking is scheduled on 22nd of May 2015.
To ensure trouble-free traffic around the construction area, the road between Ingelfingen and the system house will be closed until the end of construction work. As a substitute for the foot and cycle path, the country lane behind the system house can be utilized.
